2023
- PT. Meindo Elang Indah / PT. Pertamina Hulu Energi ONWJ
Provision of NDT Services for PHE ONWJ – 16″ EPRO-NGLJ & 12″ FPRO-ECOM Pipeline Project
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Time of Flight Diffraction (TOFD)
- Ultrasonic Testing
- Magnetic Particle Testing
(ON PROGRESS)
- PT. Timas Suplindo / HCML FPU
Provision of NDT Services for HMCL FPU TAR
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Medco Bronang
EPCI for Bronang Gas Development Project (Offshore Pipeline 14” x 30 km from Bronang WHP to new Bawal PLEM – Water Depth ranging from 86 to 89m)
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Meindo Elang Indah / Medco Forel Bronang
Provision of NDT Services For Medco E&P Natuna Ltd.- Offshore & Onshore for 8” Pipeline of Forel-Bronang Project.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
2022
- Asia Pacific Marine Contractor Co., Ltd. (APMC) / PT. Pertamina PHKT
Provision of NDT Services ln respect of Indonesia ATTAKA EB & UA P/F Decommissioning Project.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / HCML
Provision of NDT Services for HCML – MDA MBH Project (Hook-Up & Commissioning).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / HCML
Provision of NDT Services for HCML – FPU Project.
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Medco EP Natuna
Provision of NDT Services for MEDCO – HIU Phase-2 Project (Seafastening).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Medco EP Natuna
Provision of NDT Services Seafastening for MEDCO – HIU Phase-2 Project (Riser & Tie-In Spools).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Medco EP Natuna
Provision of NDT Services for MEDCO – BELIDA & MALONG Project (for Pipelay, Jacket & Topside Installation, Riser & Tie-In Spools, DPPA Modification).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Meindo Elang Indah / PC Ketapang II Ltd.
Bukit Tua Phase 2 Development (BTP2B) Project – Provision of NDT Services (PAUT) for Onshore & Offshore.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
2021
- PT. Hafar Daya Konstruksi / PT. Pertamina Hulu Energi ONWJ
PT. PHE ONWJ – Provision of NDT Services for Pipeline Replacement of Echo Waterflood Repair Project.
Scope of work :- Radiography Testing (X-Ray Crawler & Directional X-Ray).
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Meindo Elang Indah / PC Ketapang II Ltd.
Bukit Tua Phase 2 Development (BTP2B) Project – Provision of Non-Destructive Examination For Offshore Pipeline.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Petronas Carigali Indonesia
EPCIC Services for BTJT-A WHP Deck Extension and Well Tie In Bukit Tua Project (Mini Campaign) – Provision of NDT for Fabrication at Timas Cikande for Mini Campaign for Z10.
Scope of work :- Radiography Testing (Gamma Ray)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Samudara Indonesia / ENI Sepinggan Ltd.
ENI Merakes EPCI 4 For Pre-Commissioning Deep Water Project – Provision of NDT Offshore Services.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Logitech Saptanugraha / PT. Tanjung Enim Lestari Pulp & Paper
TELPP Center Pipe Service Shutdown Project – Provision of NDT Onshore Services.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Gamma Buana Persada / PT. Rekayasa Industri
Gas Processing Facilities Jambaran Tiung Biru (JTB) Project
Scope of work :- Lease of PAUT & NDT equipment.
2020
- PT. Timas Suplindo / Petronas Carigali Indonesia
EPCIC Services for BTJT A WHP Deck Extension and Well Tie In Bukit Tua Project (Mini Campaign) – Provision of NDT for Fabrication at Timas Cikande for Mini Campaign for Z08.
Scope of work :- Radiography Testing (Gamma Ray)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / HCML
HCML MDA-MBH Re-Installation Pedestal Crane Project – Provision of NDT Offshore Services.
Scope of work :- Radiography Testing (Gamma Ray)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / PT. Pertamina Hulu Energi
PHM South Mahakam EPCIC 2 Pipeline Installation Project – Provision of NDT Services for PHM South Project.
Scope of work :- Radiography Testing (X-Ray Crawler)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Hafar Daya Konstruksi
SAKA SIDAYU Project (Jacket and Topside Installation Work – Provision of NDT Offshore Services).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Hafar Daya Konstruksi
SAKA SIDAYU Project (Jacket and Topside Installation Work – Provision of NDT for WQT).
Scope of work :- Radiography Testing (Gamma Ray)
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Petronas Carigali Indonesia
EPCIC Services for BTJT A WHP Deck Extension and Well Tie In Bukit Tua Project (Mini Campaign) – Provision of NDT for Fabrication at Timas Cikande for Mini Campaign.
Scope of work :- Radiography Testing (Gamma Ray)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Kris Energy
Apsara Project (Provision of NDT Offshore Services for Jacket and Deck Installation).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Kris Energy
Apsara Project (Provision of NDT WQT Services for Jacket & Deck Installation).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Meindo Elang Indah / PT. Jawa Satu Power
Provision of NDT Services for Push Pull.
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Meindo Elang Indah / PT. Jawa Satu Power
Provision of Review RT Film Pipeline at Cilamaya Onshore and RT Team for Balaraja.
Scope of work :- Radiography Testing
- Radiography Testing
- Timas Sapura Offshore JV / Eni Sepinggan Ltd.
Provision of NDT Services for Corrosion Pipe for ENI Merakes EPCI 4.
Scope of work :- Ultrasonic Testing
- Ultrasonic Testing
- PT. Meindo Elang Indah / PT. Jawa Satu Power
Jawa-1 Project (Provision of Non-Destructive Examination For Offshore Pipeline For PLTGU Jawa 1 CCPP IPP).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Ophir
Meliwis Project – Offshore Pipeline and WHP Installation Services (Provision of NDT Offshore Services For Pipeline Rectification Work).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / CNOOC
HCML MDA-MBH Preservation Project.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Tridaya Pipeline Services / PT. Hutama Karya
NDT Services (Piping) for Station PLTGU Tanjung Batu Kaltimra.
Scope of work :- Radiography Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Medco E&P Indonesia
Buntal-5 Project (Provision of NDT Services for Offshore Installation) – 2nd Campaign.
Scope of work :- Radiography Testing
2019
- PT. Timas Suplindo / Medco E&P Indonesia
Buntal-5 Project (Provision of NDT Services for PQR, WPQT, WQT for Pipe Spool Fabrication).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Medco E&P Indonesia
Buntal-5 Project (Provision of NDT Services for Offshore Installation/ MT-UT for Umbilical Installation) – 1st Campaign.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Petronas Carigali
EPCI Services for Bukit Tua Project (Provision of NDT Services for WPQT & WQT for Fabrication Gas Lift).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Gunanusa Utama Fabricators
Becak Kayu Project (NDT Services).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Phased Array Ultrasonic Testing (PAUT)
- PT. Timas Suplindo / Ophir
Meliwis Project – Offshore Pipeline and WHP Installation Services (Provision of NDT Services For Semi Auto Pipeline, Jacket & Deck Installation).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Ophir
Meliwis Project – Offshore Pipeline and WHP Installation Services (Provision of NDT Services for PreFab Spool, Spool & Riser and WQT Structural at Timas).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Ophir
Meliwis Project – Offshore Pipeline and WHP Installation Services (Provision of NDT Services for WPQT Manual Pipeline at Timas Cikande).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Premier Oil
EPCIC Services for Bison Iguana Gajah Puteri (BIGP) Development Project – 2nd Campaign (Provision of NDT Services for Seafastening Hook Up Stuffs of PHB #1).
Scope of work :- Magnetic Particle Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Premier Oil
EPCIC Services for Bison Iguana Gajah Puteri (BIGP) Development Project – 2nd Campaign (Provision of NDT Eddy Current Services for Ex Structural Pad Eyes of Structural Turret FPSO).
Scope of work :- Eddy Current Testing
- Eddy Current Testing
- PT. Timas Suplindo / Premier Oil
EPCIC Services for Bison Iguana Gajah Puteri (BIGP) Development Project – 2nd Campaign (Provision of NDT Services for WPQT Piping & Structure for 2nd Offshore Campaign).
Scope of work :- Radiography Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Premier Oil
EPCIC Services for Bison Iguana Gajah Puteri (BIGP) Development Project – 2nd Campaign (Pipeline 10”x 39 Km & 8” x 14 KM) – Provision of NDT Offshore Services for Timas DSV.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Premier Oil
EPCIC Services for Bison Iguana Gajah Puteri (BIGP) Development Project – 2nd Campaign (Pipeline 10”x 39 Km & 8” x 14 KM) – Provision of NDT Offshore Services for Timas DLB01.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Petronas Carigali Indonesia
EPCI Services for BTJT A WHP Deck Extension and Well Tie In Bukit Tua Project (NDT for Offshore Services and WQT)
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
2018
- PT. Timas Suplindo / Kangean Energy Indonesia
EPCI Services for Subsea Facility for TSB Phase 2 Development Project (Provision of NDT Offshore Services for Telford 25 Vessel & Star Centurion Vessel).
Scope of work :- Advanced Ultrasonic Testing (AUT)
- Phased Array Ultrasonic Testing (PAUT)
- Magnetic Particle Testing
- PT. Timas Suplindo / Premier Oil
BIGP Development Project for WQT Piping and Structure.
Scope of work :- Radiography Testing
- Radiography Testing
- PT. Timas Suplindo / Premier Oil
BIGP Development Project – 1st Offshore Campaign.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Premier Oil
BIGP Development Project for WQT – 1st Offshore Campaign.
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Premier Oil
BIGP Development Project for WQT Offshore Campaign (2nd Batch).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Husky CNOOC Madura Ltd (HCML)
HCML MDA-MBH Field Development Project – Provision of NDT Services For Pipeline & Topside Installation in DLB01.
Scope of work :- Advanced Ultrasonic Testing (AUT)
- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Husky CNOOC Madura Ltd (HCML)
HCML MDA-MBH Field Development Project (WQT at DLB Barge, Batam).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Husky CNOOC Madura Ltd (HCML)
HCML MDA-MBH Field Development Project (WPQT at Cikande Workshop).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
2017
- PT. Timas Suplindo / Husky CNOOC Madura Ltd (HCML)
HCML MDA-MBH Field Development Project (WPQT & WQT).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Bukaka Teknik Utama
Jakarta To Cikampek II Elevated Toll Road Project (using PAUT for steel bridge construction with Galvanized Coating).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Phased Array Ultrasonic Testing (PAUT)
- PT. Timas Suplindo / Husky CNOOC Madura Ltd (HCML)
HCML MDA-MBH Field Development Project – Provision of NDT Radiography Services for Platform (Jacket & Topside) & Offshore Pipeline Installation.
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Husky CNOOC Madura Ltd (HCML)
HCML MDA-MBH Field Development Project (Provision of NDT Services for Jacket Installation in Hilong HLV).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo
Pipeline Repair & Replacement (WPQT & WQT).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo / PT. PHE ONWJ
Pipeline Repair & Replacement Project (Pipeline Installation).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / ConocoPhillips
Suban Expansion Facilities Project – Fabrication Vessel with Cladding material.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
2016
- PT. Nindya Karya (Persero)
Upgrading Tangsi Offtake Station Project (CP11A).
Scope of work:- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo / PT. PHE ONWJ
PHE Lima Power System and Safety Upgrade (LPSU) Project (NDT Services During Offshore Campaign – Using AWB).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Nindya Karya (Persero)
Proyek Pembangkit Listrik Tenaga Minihidro Cilaki 1B (3 x 3.230 KW) – Garut (Pengujian Las NDT Pipa Penstock).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Rekayasa Industri
Construction of Pipe Supporting SPBG Bekasi & Jakarta .
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. PGAS Solution
CP9 Muara Karang – Muara Bekasi (Pipeline Construction) – Pelaksanaan Pekerjaan Pengadaan Jasa NDT / Radiography di Lokasi Muara Karang – Muara Bekasi.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo / Star Energy
EPCI Services For Infill Well Facility Tie In Project KRA South 2 (NDT Services for Offshore Pipeline Installation & Topside Brown Field).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / Star Energy
KRA South 2 Infill Well Project (Provision of NDT Services for WPQT & WQT in Batam).
Scope of work :- Radiography Testing
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- PT. Timas Suplindo / Star Energy
KRA South 2 Infill Well Project (Provision of NDT Services for WQT Pipeline in Batam)
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / PT. PHE WMO
EPCI-1 PHE-12, PHE-24 and CPP2 Platform and Pipeline Poject (Provision of NDT Services for Spool Installation in DLB01).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
- PT. Timas Suplindo / PT. PHE WMO
EPCI-1 PHE-12, PHE-24 and CPP2 Platform and Pipeline Poject (Provision of NDT Services for Pipeline & Platform Installation in Hilong HLV).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Ultrasonic Testing
- Magnetic Particle Testing
2015
- PT. Timas Suplindo
MILA-A and ASTI-A Platforms and Pipeline.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo
Bekapai Phase 2B EPSC 2 Project (Pipeline Installation).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo
MILA-A and ASTI-A Platforms and Pipeline (Topside Installation).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Yasa Industri Nusantara
CP9 EPC Muara Karang – Muara Bekasi (Pipeline Construction) Project – NDT Services.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo / ENI Muara Bakau
Jangkrik Offshore Complex – Provision of NDT Services for Offshore Pipeline Installation.
Scope of work :- Advanced Ultrasonic Testing (AUT)
- Phased Array Ultrasonic Testing (PAUT)
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2014
- PT. Timas Suplindo
Provision of Bukit Tua Remediaton.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Yasa Industri Nusantara
CP7 Labuan Maringgai – Tj. Karang at Lampung Province.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo
Provision of Bukit Tua Onshore & Offshore Pipeline and Topside.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo
MOL (Main Oil Line)– Pipeline and T&I, Push Pull
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo
PHE-UL Field Development (Pipeline, T&I, Hook Up).
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2013
- PT. Pertamina EP
HSE Coordinator Service to support Drilling and Workover operational activities.
Scope of work :- Manpower Supply – HSE Officer
- Manpower Supply – HSE Officer
- PT. Timas Suplindo / PT. PHE ONWJ
Lima Subsidence Remediation Lifting & Jack-up Platform and Hook- Up.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo / Premier Oil
Anoa Phase 4 AGX Compression Reconfiguration.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- PT. Timas Suplindo
Reroute Gas Pipeline L- Parigi Cilamaya (Hot Tap).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2012
- PT. Timas Suplindo
Anoa Pipeline and Tie- In – 1st Campaign.
Scope of work :- Phased Array Ultrasonic Testing (PAUT)
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2010
- Saipem Indonesia
Transportation and Offshore Installation Gajah Baru.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2009
- Tanjung Enim Lestari Pulp & Paper
13 Unit Heat Exchanger Maintenance.
Scope of work :- Eddy Current Testing
2008
- PT. Gunanusa Utama Fabricators
BP Tangguh GPF Onshore – Piping.
Scope of work :- Man Power Supply – Welding Inspector
- Man Power Supply – Welding Inspector
- Saipem Indonesia
BP Tangguh GPF – Pipeline Repair Campaign.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Singapore, Pte.Ltd.
Blacktip Pipeline Double Joint Fabrication, Welder Qualification Test and Welding Procedure qualification.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Indonesia
CPP Topside Transportation & Installation.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2007
- Saipem Singapore, Pte.Ltd.
CHOC BMA-BLA-SYA Gas Field Development.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Indonesia
BP Tangguh Gas Production Facilities.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Gunanusa Utama Fabricators
Tunu Field Development, Phase11S/EPSC1&2.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Indonesia
New Crude Oil Unloading Facilities.
Scope of work :- Man Power Supply – Welding Inspector
- Man Power Supply – Welding Inspector
- Ninda Pratama Vreisindo
Ship Building Maintenance.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Singapore, Pte. Ltd.
TTP3 – TTM NDT for WQT Offshore Hookup and Tie-In.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Indonesia
BP Tangguh Gas Production Facilities.
Scope of work :- Man Power Supply – Welding Inspector
- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Heavyndo Perkasa Engineer
Tanks and Pressure Vessel Fabrication.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2006
- PT. Gunanusa Utama Fabricators
Tunu Field Development, Phase 11 S/EPSC1&2 Fabricationof South Compressionand Manifold Platform.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Saipem Indonesia
BP Tangguh Gas Production Facilities Pipeline, Piping and Spool Fabrication NDT for WQT and WPQT.
Scope of work :- Man Power Supply – Welding Inspector
- Inspector CSWIP 3.1
- Saipem Asia, Sdn.
TTPP Part 3 NDT for WQT.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Citra Panji Manunggal
Ethylene Pipeline Extension 20”x 28 Km.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Nacap Indonesia
BP Tangguh GPF & HDD NDT for WQT/WPQT.
Scope of work :- Man Power Supply – Welding Inspector
- Man Power Supply – Welding Inspector
- Nacap Indonesia
BP Tangguh GPF & HDD NDT for WQT&WPQT.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Radiography Testing
- PT. Inti Karya Persada Teknik
South Sumatra Gas Pipeline Development.
Scope of work :- Ultrasonic Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Asia, Sdn.Bhd.
Third Transmission Pipeline, TTP PLC.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Radiography Testing
- Saipem Asia, Sdn.Bhd.
Spool Fabrication Sakhalin II Phase 2.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Radiography Testing
- Heavyndo Perkasa Engineer
Amine Contactor, Amine Regenerator, Condensate Stabilizer, and Pressure Vessel Fabrication.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing Radiography Testing
- Geocean Indonesia
Offshore Installation of Shallow Water 32” Pipeline Installation Labuhan Maringgai – Bojonegara South Sumatera West Java II Contract Package 2.
Scope of work :- Ultrasonic Testing Magnetic
- Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Indonesia
Preand Post Mating LUN- A & PAB Platform Installation.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- KSOMoeladi – Adhi Karya – Krakatau Engineering
Rawa Maju, Bekasi – Walahar, Karawang Gas Pipeline Development 24” X 30 KM (CP-13).
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem Indonesia
Piping & Spool Fabrication.
Scope of work :- Man Power Supply – QC Inspector
- Man Power Supply – QC Inspector
- Saipem Indonesia
WQT, WPQT, Piping & Spool Fabrication.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2005
- PT. Gunanusa Utama Fabricators
SWP K, SWP E, Modification MWP A, MWPB,MWP CandSWP G Platforms, Peciko Field Development Phase 4.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Horizon Offshore Pte.Ltd.
Pipeline Offshore Installation Block B Subsea Development Phase 1.
Scope of work :- Man Power Supply – QC Inspector
- Dye Penetrant Testing
- Radiography Testing
- Saipem Asia, Sdn.
Lamma Power Station Extention Project.
Scope of work :- Man Power Supply – QC Inspector
- Ultrasonic Testing
- Bhakti Migas Utama
Installation of 4 units of SUKRA – Spherical LPG StrorageTanks,Sukra LPG Terminal Facilities.
Scope of work :- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
2004
- Technip Indonesia
Conoco Phillips – Block B Subsea Development Phase 1.
Scope of work :- Man Power Supply – QC Inspector
- Man Power Supply – QC Inspector
- Horizon Offshore Pte.Ltd.
Pipeline Offshore Installation Block B Subsea Development Phase 1.
Scope of work :- Man Power Supply – QC Inspector
- Dye Penetrant Testing
- Radiography Testing
- Saipem Indonesia
SWPK and SWPE Jacket and Platform Offshore Installation, PecikoField Development Phase 4.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Gunanusa Utama Fabricator
SWP K, SWP E, Modification MWP A, MWPB, MWPC and SWP.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Inti Karya Persada Teknik
Kujang 1B Ammonia– Urea NDT for WQT Piping Onshore.
Scope of work :- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Saipem UK
Bongkot Field Development Phase 3C NDT for WQT Pipeline Offshore Installation.
Scope of work :- Man Power Supply – QC Inspector
- Radiography Testing
- Dye Penetrant Testing
- Expro
Piping, Structural, and Pressure Vessel Fabrication.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Profab Indonesia
Piping, Structural, and Pressure Vessel Fabrication.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing
- Pan United
Piping, Structural, Boat, Tug Boat and Barges Fabrication.
Scope of work :- Ultrasonic Testing
- Magnetic Particle Testing
- Dye Penetrant Testing
- Radiography Testing